Archive image from page 18 of Detached breakwaters for shore protection. Detached breakwaters for shore protection . detachedbreakwat00dall Year: 1986 significant amounts of sediment causing formation of either a salient or a tombolo. An interesting multipurpose single detached breakwater project was constructed at Channel Islands, California. This structure overlaps the har- bor entrance, simultaneously shielding boats from direct wave energy and trapping material adjacent to the entrance. Venice, California 16. This rubble-mound breakwater (Figure 6) was constructed in 1905 to protect an am


Archive image from page 18 of Detached breakwaters for shore protection. Detached breakwaters for shore protection . detachedbreakwat00dall Year: 1986 significant amounts of sediment causing formation of either a salient or a tombolo. An interesting multipurpose single detached breakwater project was constructed at Channel Islands, California. This structure overlaps the har- bor entrance, simultaneously shielding boats from direct wave energy and trapping material adjacent to the entrance. Venice, California 16. This rubble-mound breakwater (Figure 6) was constructed in 1905 to protect an amusement pier. It is 180 m long, has a crest elevation of + m Figure 6. Detached breakwater at Venice. California (circa 1970) 15


Size: 1231px × 1625px
Photo credit: © Actep Burstov / Alamy / Afripics
License: Licensed
Model Released: No

Keywords: 1980, 1986, archive, book, bookauthor, bookdecade, bookpublisher, booksponsor, booksubject, bookyear, boston_library_consortium_member_libraries, breakwaters, coastal_engineering_research_center_u_s_, dally_william_r, drawing, historical, history, illustration, image, page, picture, pope_joan, print, reference, u_s_army_engineer_waterways_experiment_station, vicksburg_miss_u_s_army_engineer_waterways_experim, vintage